DAMON BESS3
ERCOT queue ID 23INR0790
DAMON BESS3 (23INR0790) is listed in the ERCOT interconnection queue as a 10 MW battery project in Brazoria County, TX. The filing names Station Name: DAMON TSP as its point of interconnection. ERCOT lists its status as “In Queue”, with a target commercial operation date of December 1, 2025. It records the interconnection agreement as signed on January 30, 2024.
| Queue ID | 23INR0790 |
|---|---|
| Project name | DAMON BESS3 |
| Status (as published) | In Queue |
| Substation | Station Name: DAMON TSP |
| Point of interconnection | Station Name: DAMON TSP Station Code: DA Load/Load Transformer Name: TR2 PTI BUS number: 42370 Voltage in kV (Transmission Level): 138 kV Node (associated w/ load/load XFRM in NMMS): TR2 |
| County | Brazoria |
| State | TX |
| Voltage | 138 kV |
| Capacity | 10 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2025-12-01 |
| Source dataset | small |
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BarBar Storage LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-01-30 |