IEP Orchard BESS

ERCOT queue ID 23INR0556

Queue ID23INR0556
Project nameIEP Orchard BESS
Status (as published)In Queue
SubstationStation Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: Voltage in kV (Transmission Level): Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP Distribution System.
Point of interconnectionStation Name (TDSP Station Code): OR Load/Load Transformer Name :TR1 PTI BUS number: 44541 Voltage in kV (Transmission Level): 138 kV Project Size: 9.99 MW battery energy storage (BESS) system; 50 MWh connecting on CNP 34.5kV Distribution System.
CountyFort Bend
StateTX
Voltage138 kV
Capacity10 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalised for filtering)
Target commercial operation2026-09-18
Source datasetsmall

Additional filed fields

Interconnecting EntityIEP Tejas Verde LLC
Cdr ZoneHOUSTON
Fuel CodeOTH
Technology CodeBA
Ia Signed45147

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.