Cascade Storage
ERCOT queue ID 23INR0376
Cascade Storage (23INR0376) is listed in the ERCOT interconnection queue as a 250 MW battery project in Brazoria County, TX. The filing names Oasis – Seabreeze circuit 27 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of June 1, 2028. It records the screening study as complete on November 29, 2021.
| Queue ID | 23INR0376 |
|---|---|
| Project name | Cascade Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Oasis – Seabreeze circuit 27 |
| Point of interconnection | 345kV Oasis (43035) – Seabreeze circuit 27 |
| County | Brazoria |
| State | TX |
| Voltage | 345 kV |
| Capacity | 250 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-06-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Oyster Creek LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2021-11-29 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.