Rocking X Solar

ERCOT queue ID 23INR0368

Rocking X Solar (23INR0368) is listed in the ERCOT interconnection queue as a 602.2 MW solar project in Parker County, TX. The filing names Tap the Parker Switch (bus#) – Comanche Peak SES (bus#) Double-Circuit line, Circuit 1. as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 20, 2027. It records the screening study as complete on December 19, 2023.

Queue ID23INR0368
Project nameRocking X Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap the Parker Switch (bus#) – Comanche Peak SES (bus#) Double-Circuit line, Circuit 1.
Point of interconnectionTap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.
CountyParker
StateTX
Voltage345 kV
Capacity602.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-20
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Parker, TX: 4 requests in the ERCOT queue, 4 active totaling 2,222.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entity7100 Tin Top LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2023-12-19
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.