Substation Scout

Holzer Solar

ERCOT queue ID 23INR0300

Queue ID23INR0300
Project nameHolzer Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationSloan Switch
Point of interconnection11165 Sloan Switch 138kV
CountyMidland
StateTX
Voltage138 kV
Capacity17.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2026-11-16
Source datasetlarge

Additional filed fields

Interconnecting EntityGreater Bryant G Solar, LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Ia Signed44760
Screening Study Complete44440
Fis Approved45756
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.