Substation Scout

Pequin Energy Storage

ERCOT queue ID 23INR0194

Pequin Energy Storage (23INR0194) is listed in the ERCOT interconnection queue as a 103.4 MW battery project in Brazoria County, TX. The filing names TN West Columbia as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 13, 2027. It records the screening study as complete on April 16, 2021.

Queue ID23INR0194
Project namePequin Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTN West Columbia
Point of interconnection39500 TN West Columbia 138kV
CountyBrazoria
StateTX
Voltage138 kV
Capacity103.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-09-13
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPequin Energy Storage, LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2021-04-16

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first