Cantaloupe Solar (23INR0116) is listed in the ERCOT interconnection queue as a 307 MW solar project in Reeves County, TX. The filing names Saragosa as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on March 9, 2021 and the interconnection agreement as signed on April 23, 2024.
| Queue ID | 23INR0116 |
|---|---|
| Project name | Cantaloupe Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Saragosa |
| Point of interconnection | 60716 Saragosa 138kV |
| County | Reeves |
| State | TX |
| Voltage | 138 kV |
| Capacity | 307 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-07-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Saragosa Del Sol Energy, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2024-04-23 |
| Screening study complete | 2021-03-09 |
| Air permit | Not Required |
| Water availability | Not Required |