Cantaloupe Solar

ERCOT queue ID 23INR0116

Cantaloupe Solar (23INR0116) is listed in the ERCOT interconnection queue as a 307 MW solar project in Reeves County, TX. The filing names Saragosa as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of July 1, 2028. It records the screening study as complete on March 9, 2021 and the interconnection agreement as signed on April 23, 2024.

Queue ID23INR0116
Project nameCantaloupe Solar
Status (as published)SS Completed, FIS Started, IA
SubstationSaragosa
Point of interconnection60716 Saragosa 138kV
CountyReeves
StateTX
Voltage138 kV
Capacity307 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-07-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Reeves, TX: 27 requests in the ERCOT queue, 24 active totaling 8,349.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySaragosa Del Sol Energy, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2024-04-23
Screening study complete2021-03-09
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.