Cascade Solar

ERCOT queue ID 23INR0091

Cascade Solar (23INR0091) is listed in the ERCOT interconnection queue as a 171 MW solar project in Brazoria County, TX. The filing names SAVANAH as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of January 15, 2028. It records the screening study as complete on May 6, 2021, the full interconnection study as approved on September 2, 2025 and the interconnection agreement as signed on April 17, 2023.

Queue ID23INR0091
Project nameCascade Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationSAVANAH
Point of interconnection43180 SAVANAH 345 kV
CountyBrazoria
StateTX
Voltage345 kV
Capacity171 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-01-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityCascade Solar Energy, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2023-04-17
Screening study complete2021-05-06
Full interconnection study approved2025-09-02
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.