Cascade Solar
ERCOT queue ID 23INR0091
Cascade Solar (23INR0091) is listed in the ERCOT interconnection queue as a 171 MW solar project in Brazoria County, TX. The filing names SAVANAH as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of January 15, 2028. It records the screening study as complete on May 6, 2021, the full interconnection study as approved on September 2, 2025 and the interconnection agreement as signed on April 17, 2023.
| Queue ID | 23INR0091 |
|---|---|
| Project name | Cascade Solar |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | SAVANAH |
| Point of interconnection | 43180 SAVANAH 345 kV |
| County | Brazoria |
| State | TX |
| Voltage | 345 kV |
| Capacity | 171 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-01-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Cascade Solar Energy, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2023-04-17 |
| Screening study complete | 2021-05-06 |
| Full interconnection study approved | 2025-09-02 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.