Caliche Mound Solar
ERCOT queue ID 23INR0056
Caliche Mound Solar (23INR0056) is listed in the ERCOT interconnection queue as a 407.6 MW solar project in Deaf Smith County, TX. The filing names Mule Deer Switch (tap AJSwope - Windmill) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 26, 2027. It records the screening study as complete on September 8, 2020, the full interconnection study as approved on September 17, 2026 and the interconnection agreement as signed on October 12, 2023.
| Queue ID | 23INR0056 |
|---|---|
| Project name | Caliche Mound Solar |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Mule Deer Switch (tap AJSwope - Windmill) |
| Point of interconnection | Mule Deer Switch 23921 (tap 345kV 23906 AJSwope - 23910 Windmill) |
| County | Deaf Smith |
| State | TX |
| Voltage | 345 kV |
| Capacity | 407.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-10-26 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Deaf Smith, TX: 11 requests in the ERCOT queue, 11 active totaling 6,391.9 MW.
Tracked changes
2 changes observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | +1 | SS Completed, FIS Completed, IA → SS Completed, FIS Completed, IA |
| 2026-10-05 | Status change | n/a | SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA |
Additional filed fields
| Interconnecting entity | CIG DS1 LLC |
|---|---|
| CDR reporting zone | PANHANDLE |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2023-10-12 |
| Screening study complete | 2020-09-08 |
| Full interconnection study approved | 2026-09-17 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.