Tanglewood Solar

ERCOT queue ID 23INR0054

Tanglewood Solar (23INR0054) is listed in the ERCOT interconnection queue as a 251 MW solar project in Brazoria County, TX. The filing names Seabreeze Substation as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 31, 2026. It records the screening study as complete on September 28, 2020, the full interconnection study as approved on June 3, 2024 and the interconnection agreement as signed on November 1, 2022.

Queue ID23INR0054
Project nameTanglewood Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationSeabreeze Substation
Point of interconnection345kV Seabreeze Substation
CountyBrazoria
StateTX
Voltage345 kV
Capacity251 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-10-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Brazoria, TX: 63 requests in the ERCOT queue, 54 active totaling 10,984.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBrazoria Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2022-11-01
Screening study complete2020-09-28
Full interconnection study approved2024-06-03
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.