Substation Scout

Grandslam Solar

ERCOT queue ID 21INR0391

Queue ID21INR0391
Project nameGrandslam Solar
Status (as published)SS Completed, FIS Started, IA
SubstationMiracle Lake
Point of interconnection5700 Miracle Lake 138kV
CountyAtascosa
StateTX
Voltage138 kV
Capacity121.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2026-11-28
Source datasetlarge

Additional filed fields

Interconnecting EntityGrandslam Solar, L.L.C.
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Ia Signed44225
Screening Study Complete43768
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.