Pecan Prairie South (21INR0371) is listed in the ERCOT interconnection queue as a 133 MW solar project in Leon County, TX. The filing names CTT Yellow Wolf, bus # as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of May 1, 2027. It records the screening study as complete on November 5, 2019, the full interconnection study as approved on March 13, 2026 and the interconnection agreement as signed on February 21, 2021.

Queue ID21INR0371
Project namePecan Prairie South
Status (as published)SS Completed, FIS Completed, IA
SubstationCTT Yellow Wolf, bus #
Point of interconnectionCTT Yellow Wolf, bus # 79007
CountyLeon
StateTX
VoltageNot reported
Capacity133 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-05-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

CTT Yellow Wolf, bus # substation: 2 requests in the ERCOT queue, 2 active totaling 457.1 MW.

Queue IDProjectMWResourceStatus
21INR0428Pecan Prairie North324.1SolarSS Completed, FIS Completed, IA

Leon, TX: 14 requests in the ERCOT queue, 13 active totaling 6,147.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityConnectGen Operating LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2021-02-21
Screening study complete2019-11-05
Full interconnection study approved2026-03-13
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first