CTT Yellow Wolf, bus # substation interconnection queue
2 active projects totaling 457.1 MW in the ERCOT queue.
2 ERCOT queue filings name CTT Yellow Wolf, bus # as the point of interconnection, all in Leon County, TX.
Target commercial operation dates as filed run from May 2027 to Jun 2027 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: CG Leon County II LLC (1 filing), ConnectGen Operating LLC (1 filing).
2active projects
457.1active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 21INR0428 | Pecan Prairie North | n/r | 324.1 | Solar | SS Completed, FIS Completed, IA | Jun 2027 |
| 21INR0371 | Pecan Prairie South | n/r | 133 | Solar | SS Completed, FIS Completed, IA | May 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.