Indigo Solar

ERCOT queue ID 21INR0031

Indigo Solar (21INR0031) is listed in the ERCOT interconnection queue as a 150 MW solar project in Fisher County, TX. The filing names tap Claytonville – Phantom Hill Circuit 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of September 17, 2027. It records the screening study as complete on November 20, 2018 and the interconnection agreement as signed on September 15, 2020.

Queue ID21INR0031
Project nameIndigo Solar
Status (as published)SS Completed, FIS Started, IA
Substationtap Claytonville – Phantom Hill Circuit 2
Point of interconnectiontap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2
CountyFisher
StateTX
Voltage345 kV
Capacity150 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

tap Claytonville – Phantom Hill Circuit 2 substation: 5 requests in the ERCOT queue, 5 active totaling 390 MW.

Queue IDProjectMWResourceStatus
24INR0496Indigo Storage60BatterySS Completed, FIS Started, IA
25INR0528Indigo Storage 260BatterySS Completed, FIS Started, IA
25INR0529Indigo Storage 360BatterySS Completed, FIS Started, IA
25INR0530Indigo Storage 460BatterySS Completed, FIS Started, IA

Fisher, TX: 13 requests in the ERCOT queue, 13 active totaling 6,376 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityInnovative Solar 245, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2020-09-15
Screening study complete2018-11-20
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.