Renegade Project
ERCOT queue ID 20INR0255
Renegade Project (20INR0255) is listed in the ERCOT interconnection queue as a 520 MW solar project in Deaf Smith County, TX. The filing names Tap Windmill - AJ Swope as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of November 1, 2028. It records the screening study as complete on May 17, 2019 and the interconnection agreement as signed on January 4, 2021.
| Queue ID | 20INR0255 |
|---|---|
| Project name | Renegade Project |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Windmill - AJ Swope |
| Point of interconnection | Tap 345kV 23910 Windmill - 23906 AJ Swope |
| County | Deaf Smith |
| State | TX |
| Voltage | 345 kV |
| Capacity | 520 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-11-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Deaf Smith, TX: 11 requests in the ERCOT queue, 11 active totaling 6,391.9 MW.
Tracked changes
1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Capacity revised | +4.3 | SS Completed, FIS Started, IA → SS Completed, FIS Started, IA |
Additional filed fields
| Interconnecting entity | Renegade Renewable LLC |
|---|---|
| CDR reporting zone | PANHANDLE |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2021-01-04 |
| Screening study complete | 2019-05-17 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.