Desert Sky repower (17INR0070) is listed in the ERCOT interconnection queue as a 7.2 MW wind project in Pecos County, TX. The filing names two LCRA as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of January 15, 2027. It records the screening study as complete on November 28, 2017, the full interconnection study as approved on February 6, 2018 and the interconnection agreement as signed on October 18, 2018.

Queue ID17INR0070
Project nameDesert Sky repower
Status (as published)SS Completed, FIS Completed, IA
Substationtwo LCRA
Point of interconnectiontwo LCRA 138kV
CountyPecos
StateTX
Voltage138 kV
Capacity7.2 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2027-01-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Pecos, TX: 63 requests in the ERCOT queue, 58 active totaling 21,379.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityDESERT SKY WIND FARM LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2018-10-18
Screening study complete2017-11-28
Full interconnection study approved2018-02-06
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first