Colorado, TX interconnection queue

14 active projects totalling 1,784.2 MW in the ERCOT queue, plus 2 with terminal status (shown greyed).

14active projects
1,784.2active MW
16total filed
Queue IDProjectkVMWResourceStatus
21INR0349 Pearl Crescent Solar 138 208.4 Solar Cancelled
28INR0321 Altair Energy Storage 138 201.8 Battery SS Completed, FIS Started, No IA
25INR0186 Moonlight Sonata BESS 138 201.1 Battery SS Completed, FIS Started, No IA
26INR0259 Cottontail Energy Center 138 200.9 Battery SS Completed, FIS Started, No IA
27INR0147 Paloma Energy Center 138 193.8 Solar SS Completed, FIS Started, No IA
27INR0555 Montezuma Storage 138 183.9 Battery SS Completed, FIS Started, No IA
29INR0123 Firefly Fields Storage 138 156.5 Battery SS Completed, FIS Started, No IA
25INR0402 Driet BESS 138 150.5 Battery SS Completed, FIS Started, IA
27INR0321 Rock Island Generating (TEF -Due Diligence) 138 121.8 Gas SS Completed, FIS Completed, IA
29INR0085 Firefly Fields Solar 138 100.5 Solar SS Completed, FIS Started, No IA
30INR0045 Radiant Plains Energy Center BESS n/r 100 Battery SS Completed, FIS Started, No IA
32INR0002 Radiant Plains Energy Center Solar n/r 100 Solar SS Completed, FIS Started, No IA
27INR0148 Paloma Energy Center BESS 138 53.6 Battery SS Completed, FIS Started, No IA
21INR0470 Pearl Crescent Storage 138 50.3 Battery Cancelled
25INR0768 Stafford Hill BESS 12.5 9.9 Battery In Queue
25INR0769 Kleimann BESS 12.5 9.9 Battery In Queue

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.