Caldwell, TX interconnection queue

17 active projects totalling 4,718.9 MW in the ERCOT queue.

17active projects
4,718.9active MW
17total filed
Queue IDProjectkVMWResourceStatus
30INR0031 Caldwell County Energy Center 345 1,500 Gas SS Completed, FIS Started, No IA
30INR0054 SCHNEIDER COMBINED CYCLE 345 880 Gas SS Completed, FIS Started, IA
29INR0340 Bobcat Generating Station 345 450 Gas SS Started, FIS Started, No IA
29INR0167 Big Watt Power Austin-1 345 449 Gas SS Completed, FIS Started, No IA
24INR0459 Exodus BESS 345 201.4 Battery SS Completed, FIS Started, No IA
23INR0135 Elbus BESS 138 201 Battery SS Completed, FIS Started, No IA
27INR0478 Metro BESS 138 200.7 Battery SS Completed, FIS Started, No IA
26INR0523 Demeter Storage 2 138 138 Battery SS Completed, FIS Started, No IA
29INR0176 SCHNEIDER GAS RICE 345 113 Gas SS Completed, FIS Started, IA
31INR0013 SCHNEIDER GAS RICE PHASE 2 345 113 Gas SS Completed, FIS Started, IA
23INR0503 Ardesia Storage 138 100 Battery SS Completed, FIS Started, No IA
25INR0129 Demeter Solar 138 88 Solar SS Completed, FIS Started, No IA
27INR0585 Lytton Springs BESS 345 76.4 Battery SS Completed, FIS Started, No IA
25INR0130 Demeter Storage 138 65 Battery SS Completed, FIS Started, No IA
27INR0584 Lytton Springs Solar 345 55.3 Solar SS Completed, FIS Started, No IA
20INR0245 Volunteer Storage 138 50.6 Battery SS Completed, FIS Started, No IA
22INR0473 TAIN SOLAR 138 37.5 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.