Citrus, FL interconnection queue
9 active projects totaling 2,293.9 MW in the Duke Energy queue, plus 13 with terminal status (shown grayed).
9active projects
2,293.9active MW
22total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 111 | Not reported | n/r | 950 | Gas | Withdrawn |
| 123 | Not reported | n/r | 940 | Gas | Operational |
| 124 | Not reported | n/r | 940 | Gas | Operational |
| 10 | Not reported | n/r | 700 | Gas | Withdrawn |
| FC100380 | Not reported | 230 | 199 | Battery | Active |
| 41 | Not reported | n/r | 140 | Nuclear | Withdrawn |
| 327 | Not reported | n/r | 100 | Battery | Active |
| 198 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 199 | Not reported | n/r | 74.9 | Solar | Operational |
| 234 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 239 | Not reported | n/r | 74.5 | Solar | Withdrawn |
| 141 | Not reported | n/r | 50 | Solar | Withdrawn |
| 196 | Not reported | n/r | 40 | Solar | Withdrawn |
| 40 | Not reported | n/r | 26 | Nuclear | Withdrawn |
| 39 | Not reported | n/r | 14 | Nuclear | Withdrawn |
| 49 | Not reported | n/r | 14 | Coal | Withdrawn |
| 42 | Not reported | n/r | 10 | Coal | Operational |
| 43 | Not reported | n/r | 10 | Coal | Operational |
| 44 | Not reported | n/r | 10 | Coal | Operational |
| 45 | Not reported | n/r | 10 | Coal | Operational |
| 56 | Not reported | n/r | 8 | Coal | Withdrawn |
| 57 | Not reported | n/r | 4 | Coal | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner