Citrus, FL interconnection queue

9 active projects totaling 2,293.9 MW in the Duke Energy queue, plus 13 with terminal status (shown grayed).

9active projects
2,293.9active MW
22total filed
Queue IDProjectkVMWResourceStatus
111 Not reported n/r 950 Gas Withdrawn
123 Not reported n/r 940 Gas Operational
124 Not reported n/r 940 Gas Operational
10 Not reported n/r 700 Gas Withdrawn
FC100380 Not reported 230 199 Battery Active
41 Not reported n/r 140 Nuclear Withdrawn
327 Not reported n/r 100 Battery Active
198 Not reported n/r 74.9 Solar Withdrawn
199 Not reported n/r 74.9 Solar Operational
234 Not reported n/r 74.9 Solar Withdrawn
239 Not reported n/r 74.5 Solar Withdrawn
141 Not reported n/r 50 Solar Withdrawn
196 Not reported n/r 40 Solar Withdrawn
40 Not reported n/r 26 Nuclear Withdrawn
39 Not reported n/r 14 Nuclear Withdrawn
49 Not reported n/r 14 Coal Withdrawn
42 Not reported n/r 10 Coal Operational
43 Not reported n/r 10 Coal Operational
44 Not reported n/r 10 Coal Operational
45 Not reported n/r 10 Coal Operational
56 Not reported n/r 8 Coal Withdrawn
57 Not reported n/r 4 Coal Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.