Substation Scout

Duke Energy request FC100380

Duke Energy queue ID FC100380

Queue request FC100380 was listed in the Duke Energy interconnection queue at the end of 2025 as a 199 MW battery project in Citrus County, FL, according to Berkeley Lab’s queue data file. The filing names Citrus Combined Cycle Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2030.

Queue IDFC100380
Project nameNot reported
Status (as published)Active
SubstationCitrus Combined Cycle Substation
Point of interconnectionCitrus Combined Cycle 230 kV Substation
CountyCitrus
StateFL
Voltage230 kV
Capacity199 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2030-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Citrus Combined Cycle Substation substation: 5 requests in the Duke Energy queue, 4 active totaling 2,153.9 MW.

Queue IDProjectMWResourceStatus
123Not reported940GasOperational
124Not reported940GasOperational
199Not reported74.9SolarOperational
234Not reported74.9SolarWithdrawn

Citrus, FL: 22 requests in the Duke Energy queue, 9 active totaling 2,293.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
ClusterCluster: 2025 Annual DEF FERC Cluster; Cluster Sub Group: North
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Queue date2025-12-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first