Duke Energy request 42

Duke Energy queue ID 42

Queue request 42 was listed in the Duke Energy interconnection queue at the end of 2025 as a 10 MW coal project in Citrus County, FL, according to Berkeley Lab’s queue data file. The filing names Crystal River Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 1, 2008.

Queue ID42
Project nameNot reported
Status (as published)Operational
SubstationCrystal River Substation
Point of interconnectionCrystal River Substation
CountyCitrus
StateFL
VoltageNot reported
Capacity10 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2008-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Crystal River Substation substation: 11 requests in the Duke Energy queue, 4 active totaling 40 MW.

Queue IDProjectMWResourceStatus
43Not reported10CoalOperational
44Not reported10CoalOperational
45Not reported10CoalOperational
10Not reported700GasWithdrawn
41Not reported140NuclearWithdrawn
40Not reported26NuclearWithdrawn
39Not reported14NuclearWithdrawn
49Not reported14CoalWithdrawn
56Not reported8CoalWithdrawn
57Not reported4CoalWithdrawn

Citrus, FL: 22 requests in the Duke Energy queue, 9 active totaling 2,293.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2006-12-11
Operational date1982-06-30

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.