Substation Scout

Duke Energy request 124

Duke Energy queue ID 124

Queue request 124 was listed in the Duke Energy interconnection queue at the end of 2025 as a 940 MW gas project in Citrus County, FL, according to Berkeley Lab’s queue data file. The filing names Citrus Combined Cycle Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of August 1, 2018.

Queue ID124
Project nameNot reported
Status (as published)Operational
SubstationCitrus Combined Cycle Substation
Point of interconnectionCitrus Combined Cycle Substation
CountyCitrus
StateFL
VoltageNot reported
Capacity940 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2018-08-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Citrus Combined Cycle Substation substation: 5 requests in the Duke Energy queue, 4 active totaling 2,153.9 MW.

Queue IDProjectMWResourceStatus
123Not reported940GasOperational
FC100380Not reported199BatteryActive
199Not reported74.9SolarOperational
234Not reported74.9SolarWithdrawn

Citrus, FL: 22 requests in the Duke Energy queue, 9 active totaling 2,293.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperDuke Energy Florida, LLC
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2013-09-19
Operational date2018-11-24

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first