Buncombe, NC interconnection queue

11 active projects totaling 677.1 MW in the Duke Energy queue, plus 4 with terminal status (shown grayed).

11active projects
677.1active MW
15total filed
Queue IDProjectkVMWResourceStatus
8599 Not reported 115 470 Gas Withdrawn
8597 Not reported 115 280 Gas Operational
8598 Not reported 230 280 Gas Operational
8600 Not reported 230 280 Gas Withdrawn
191894 Not reported 230 30.5 Battery Active
138678 Not reported n/r 26.3 Battery Withdrawn
900843 Not reported 115 19.9 Gas Active
900845 Not reported 230 19.9 Gas Active
49220 Not reported n/r 17.3 Battery Active
24747 Not reported n/r 9.5 Solar Active
898147 Not reported n/r 8.8 Solar Withdrawn
957688 Not reported 115 5 Gas Active
957691 Not reported 115 5 Gas Active
PP00019 Not reported n/r 5 Gas Active
PP00020 Not reported n/r 5 Gas Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.