Duke Energy request 8597
Duke Energy queue ID 8597
Queue request 8597 was listed in the Duke Energy interconnection queue at the end of 2025 as a 280 MW gas project in Buncombe County, NC, according to Berkeley Lab’s queue data file. The filing names Asheville Energy Complex Switchyard; Asheville Plant as its point of interconnection. Its status as of December 31, 2025 was “Operational”.
| Queue ID | 8597 |
|---|---|
| Project name | Not reported |
| Status (as published) | Operational |
| Substation | Asheville Energy Complex Switchyard; Asheville Plant |
| Point of interconnection | Asheville Energy Complex 115 kV Switchyard; Asheville Plant |
| County | Buncombe |
| State | NC |
| Voltage | 115 kV |
| Capacity | 280 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | Not reported |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Asheville Energy Complex Switchyard; Asheville Plant substation: 4 requests in the Duke Energy queue, 2 active totaling 560 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 8598 | Not reported | 280 | Gas | Operational |
| 8599 | Not reported | 470 | Gas | Withdrawn |
| 8600 | Not reported | 280 | Gas | Withdrawn |
Buncombe, NC: 15 requests in the Duke Energy queue, 11 active totaling 677.1 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Developer | Duke Energy Progress, LLC |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | Commercial Operation - Commercial Operation Date Declared |
| Queue date | 2015-12-15 |
| Operational date | 2019-12-27 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.