Substation Scout

Duke Energy request PP00020

Duke Energy queue ID PP00020

Queue request PP00020 was listed in the Duke Energy interconnection queue at the end of 2025 as a 5 MW gas project in Buncombe County, NC, according to Berkeley Lab’s queue data file. The filing names Asheville as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 30, 2027.

Queue IDPP00020
Project nameNot reported
Status (as published)Active
SubstationAsheville
Point of interconnectionAsheville
CountyBuncombe
StateNC
VoltageNot reported
Capacity5 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-05-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Asheville substation: 2 requests in the Duke Energy queue, 2 active totaling 10 MW.

Queue IDProjectMWResourceStatus
PP00019Not reported5GasActive

Buncombe, NC: 15 requests in the Duke Energy queue, 11 active totaling 677.1 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Determination of Study Requirement
Queue date2025-04-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.