Duke Energy request 191894

Duke Energy queue ID 191894

Queue request 191894 was listed in the Duke Energy interconnection queue at the end of 2025 as a 30.5 MW battery project in Buncombe County, NC, according to Berkeley Lab’s queue data file. The filing names Craggy Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2026.

Queue ID191894
Project nameNot reported
Status (as published)Active
SubstationCraggy Switching Station
Point of interconnectionCraggy 230kV Switching Station
CountyBuncombe
StateNC
Voltage230 kV
Capacity30.5 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Buncombe, NC: 15 requests in the Duke Energy queue, 11 active totaling 677.1 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC
ClusterTransitional Cluster Study
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Construction - In Progress
Queue date2021-08-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.