Duke Energy request 191894
Duke Energy queue ID 191894
Queue request 191894 was listed in the Duke Energy interconnection queue at the end of 2025 as a 30.5 MW battery project in Buncombe County, NC, according to Berkeley Lab’s queue data file. The filing names Craggy Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2026.
| Queue ID | 191894 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Craggy Switching Station |
| Point of interconnection | Craggy 230kV Switching Station |
| County | Buncombe |
| State | NC |
| Voltage | 230 kV |
| Capacity | 30.5 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2026-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Buncombe, NC: 15 requests in the Duke Energy queue, 11 active totaling 677.1 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Developer | Duke Energy Progress, LLC |
| Cluster | Transitional Cluster Study |
| Interconnection service | NRIS/ERIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Construction - In Progress |
| Queue date | 2021-08-18 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.