Duke Energy request 8598

Duke Energy queue ID 8598

Queue request 8598 was listed in the Duke Energy interconnection queue at the end of 2025 as a 280 MW gas project in Buncombe County, NC, according to Berkeley Lab’s queue data file. The filing names Asheville Energy Complex Switchyard; Asheville Plant as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue ID8598
Project nameNot reported
Status (as published)Operational
SubstationAsheville Energy Complex Switchyard; Asheville Plant
Point of interconnectionAsheville Energy Complex 230 kV Switchyard; Asheville Plant
CountyBuncombe
StateNC
Voltage230 kV
Capacity280 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Asheville Energy Complex Switchyard; Asheville Plant substation: 4 requests in the Duke Energy queue, 2 active totaling 560 MW.

Queue IDProjectMWResourceStatus
8597Not reported280GasOperational
8599Not reported470GasWithdrawn
8600Not reported280GasWithdrawn

Buncombe, NC: 15 requests in the Duke Energy queue, 11 active totaling 677.1 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Commercial Operation - Commercial Operation Date Declared
Queue date2015-12-15
Operational date2019-12-27

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.