Substation Scout

Fairview-Rogue No 1 line. substation interconnection queue

2 active projects totalling 580 MW in the BPA queue.

2active projects
580active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0972 Not reported 230 300 Wind STUDY
G0724 Not reported 230 280 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.