Curry, OR interconnection queue
2 active projects totalling 580 MW in the BPA queue, plus 4 with terminal status (shown greyed).
2active projects
580active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0972 | Not reported | 230 | 300 | Wind | STUDY |
| G0724 | Not reported | 230 | 280 | Battery | STUDY |
| G0990 | Not reported | 230 | 200 | Wind | WITHDRAWN |
| G0991 | Not reported | 230 | 200 | Wind | WITHDRAWN |
| G81 | Clipper WindPower | 115 | 53 | Wind | WITHDRAWN |
| G17 | JP Saylor and Associates | 230 | 25 | Wind | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.