Substation Scout

Decatur Substation substation interconnection queue

2 active projects totalling 3 MW in the BPA queue.

2active projects
3active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0631 Decatur Island Battery Storage n/r 2 Battery ENERGIZED
G0587 Decatur Island Solar n/r 1 Solar ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.