Substation Scout

Alcoa Substation substation interconnection queue

1 active project totalling 46 MW in the BPA queue, plus 2 with terminal status (shown greyed).

1active projects
46active MW
3total filed
Queue IDProjectkVMWResourceStatus
G28 Not reported n/r 100 Gas WITHDRAWN
G43 Clatskanie 115 88 Gas WITHDRAWN
G1008 River Road Generating Plant 115 46 Gas ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.