Columbia, OR interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G15 Oregon Energy Company 115 170 Gas WITHDRAWN
G47 Nordic Energy Barge No 2 n/r 170 Gas WITHDRAWN
G43 Clatskanie 115 88 Gas WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.