6 active projects totalling 309 MW in the BPA queue, plus 7 with terminal status (shown greyed).

6active projects
309active MW
13total filed
Queue IDProjectkVMWResourceStatus
G23 500MW St Johns-Ross 230 500 Gas WITHDRAWN
G46-01 Clark Public Utilities 115 250 Gas WITHDRAWN
G129 River Road Generating Plant n/r 240 Gas ENERGIZED
G28 Not reported n/r 100 Gas WITHDRAWN
G0495 Not reported n/r 60 Gas WITHDRAWN
G22 50MW Alcoa-St Johns 115 50 Gas WITHDRAWN
G42 50MW Alcoa 230 50 Gas WITHDRAWN
G1008 River Road Generating Plant 115 46 Gas ENERGIZED
G1058 Not reported 115 20 Battery STUDY
G0464 Not reported n/r 5 Other WITHDRAWN
G0569 Ross MHQ Solar Project n/r 1 Solar ENERGIZED
G0968 Community Solar East n/r 1 Solar ENERGIZED
G1068 DSHS Vancouver Solar 115 1 Solar ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.