BPA queue ID G1093

Queue IDG1093
Project nameNot reported
Status (as published)CONST AGRMT EXE
SubstationPonderosa-Pilot Butte No 1 line
Point of interconnectionPonderosa-Pilot Butte No 1 230 kV line
CountyDeschutes
StateOR
Voltage230 kV
Capacity1 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2026-06-01
Source datasetbpa-generation

Tracked changes

1 change observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-12 Status change n/a STUDY → CONST AGRMT EXE

Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiPonderosa-Pilot Butte No 1 230 kV line
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total0.8
Max Summer Mw1
Max Winter Mw1
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.