BPA queue ID G1092

Queue IDG1092
Project nameNot reported
Status (as published)STUDY
SubstationWhite Bluffs-Richland No 1 line. At the City of Richland’s Sandhill Crane Substation connected at . Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 line.
Point of interconnectionWhite Bluffs-Richland No 1 115kV line. At the City of Richland’s Sandhill Crane Substation connected at 12.5kV. Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 115kV line.
CountyBenton
StateWA
Voltage115 kV
Capacity13.2 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2027-01-29
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiWhite Bluffs-Richland No 1 115kV line. At the City of Richland’s Sandhill Crane Substation connected at 12.5kV. Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 115kV line.
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total13.2
Max Summer Mw13.2
Max Winter Mw13.2
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.