Not reported
BPA queue ID G1092
| Queue ID | G1092 |
|---|---|
| Project name | Not reported |
| Status (as published) | STUDY |
| Substation | White Bluffs-Richland No 1 line. At the City of Richland’s Sandhill Crane Substation connected at . Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 line. |
| Point of interconnection | White Bluffs-Richland No 1 115kV line. At the City of Richland’s Sandhill Crane Substation connected at 12.5kV. Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 115kV line. |
| County | Benton |
| State | WA |
| Voltage | 115 kV |
| Capacity | 13.2 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-01-29 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | White Bluffs-Richland No 1 115kV line. At the City of Richland’s Sandhill Crane Substation connected at 12.5kV. Sandhill Crane is connected to BPA’s transmission system via the White Bluffs-Richland No 1 115kV line. |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 13.2 |
| Max Summer Mw | 13.2 |
| Max Winter Mw | 13.2 |
| Reason Not Completed | . |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.