BPA queue ID G1090

Queue IDG1090
Project nameNot reported
Status (as published)STUDY
SubstationPeninsula Light’s Purdy Substation Goodnough Dr. NW, Gig Harbor, WA
Point of interconnectionPeninsula Light’s Purdy Substation 13605 Goodnough Dr. NW, Gig Harbor, WA 98332
CountyPierce
StateWA
VoltageNot reported
Capacity1 MW
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2026-01-30
Source datasetbpa-generation

Tracked changes

No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeERIS
PoiPeninsula Light’s Purdy Substation 13605 Goodnough Dr. NW, Gig Harbor, WA 98332
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total1
Max Summer Mw1
Max Winter Mw1
Reason Not Completed.

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.