BPA queue ID G1015
| Queue ID | G1015 |
|---|---|
| Project name | Not reported |
| Status (as published) | STUDY |
| Substation | Lower Monumental-Hanford No 1 line. |
| Point of interconnection | Lower Monumental-Hanford No 1 500kV line. |
| County | Benton |
| State | WA |
| Voltage | 500 kV |
| Capacity | 270 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | ERIS |
| Poi | Lower Monumental-Hanford No 1 500kV line. |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 275.7 |
| Max Summer Mw | 270 |
| Max Winter Mw | 270 |
| Cluster | Transition Cluster |
| Reason Not Completed | . |
| Comments | TriCities/Umatilla1 Study Area |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.