BPA queue ID G0617

Queue IDG0617
Project nameNot reported
Status (as published)STUDY COMPLETED
SubstationJohn Day No 2 transmission line or Biglow Canyon Substation.
Point of interconnectionJohn Day No 2 230 kV transmission line or Biglow Canyon Substation.
CountySherman
StateOR
Voltage230 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar/Photovoltaic
Resource categorySolar (normalised for filtering)
Target commercial operation2022-08-01
Source datasetbpa-generation

Tracked changes

2 changes observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-12 Capacity revised −200 STUDY COMPLETED → STUDY COMPLETED
2026-10-05 Status change n/a STUDY → STUDY COMPLETED

Full change log →

Additional filed fields

Connection TypeGI
Interconnection TypeNRIS & ERIS
PoiJohn Day No 2 230 kV transmission line or Biglow Canyon Substation.
Generator TypePhotovoltaic
Fuel SourceSolar
Nameplate Mw Total300
Max Summer Mw0
Max Winter Mw0
Reason Not Completed.
Comments200 MW solar facility with a 100/4hr battery, generating a max of 200 MW at POI combined with Golden Hills Wind (G0099 - part 2).

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.