Lilliwaup Falls Hydro Project
BPA queue ID G0498
| Queue ID | G0498 |
|---|---|
| Project name | Lilliwaup Falls Hydro Project |
| Status (as published) | ENERGIZED |
| Substation | BPA Potlatch Substation |
| Point of interconnection | BPA Potlatch Substation |
| County | Mason |
| State | WA |
| Voltage | Not reported |
| Capacity | 2 MW |
| Resource (as published) | Water/Hydro |
| Resource category | Hydro (normalised for filtering) |
| Target commercial operation | 2014-10-20 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Requestor | Lilliwaup Falls Generating Company |
|---|---|
| Connection Type | GI |
| Interconnection Type | ERIS |
| Poi | BPA Potlatch Substation |
| Generator Type | Hydro |
| Fuel Source | Water |
| Nameplate Mw Total | 2 |
| Max Summer Mw | 2 |
| Max Winter Mw | 2 |
| Reason Not Completed | . |
| Comments | 1.75 MW Request |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.