Not reported
BPA queue ID G0374
| Queue ID | G0374 |
|---|---|
| Project name | Not reported |
| Status (as published) | CONST AGRMT EXE |
| Substation | Goshen-Palisades transmission line |
| Point of interconnection | 115 kV Goshen-Palisades transmission line |
| County | Bonneville |
| State | ID |
| Voltage | 115 kV |
| Capacity | 58 MW |
| Resource (as published) | Wind Turbine/Wind Turbine |
| Resource category | Wind (normalised for filtering) |
| Target commercial operation | 2010-12-31 |
| Source dataset | bpa-generation |
Tracked changes
1 change observed between weekly snapshots of the BPA queue since BPA tracking began on September 22, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-05 | Status change | n/a | ENERGIZED → CONST AGRMT EXE |
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS |
| Poi | 115 kV Goshen-Palisades transmission line |
| Generator Type | Wind Turbine |
| Fuel Source | Wind Turbine |
| Nameplate Mw Total | 57.6 |
| Max Summer Mw | 58 |
| Max Winter Mw | 58 |
| Reason Not Completed | . |
| Comments | on-line August 2012 |