Bonneville, ID interconnection queue

1 active project totalling 58 MW in the BPA queue, plus 2 with terminal status (shown greyed).

1active projects
58active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0967 Not reported 161 150 Solar WITHDRAWN
G0374 Not reported 115 58 Wind CONST AGRMT EXE
G1006 Not reported n/r 43 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.