Juniper Canyon 2
BPA queue ID G0242
| Queue ID | G0242 |
|---|---|
| Project name | Juniper Canyon 2 |
| Status (as published) | ENERGIZED |
| Substation | Horse Heaven-Harvalum line |
| Point of interconnection | Horse Heaven-Harvalum 230 kV line |
| County | Klickitat |
| State | WA |
| Voltage | 230 kV |
| Capacity | 90 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2020-12-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Requestor | Avangrid Power, LLC |
|---|---|
| Connection Type | GI |
| Interconnection Type | NRIS |
| Poi | Horse Heaven-Harvalum 230 kV line |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 90 |
| Max Summer Mw | 90 |
| Max Winter Mw | 90 |
| Reason Not Completed | . |
| Comments | FAS Restudy Issued 1/19/2017. 4/3/18: Resource fuel type changed from wind to solar |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.