Adams, WA interconnection queue
2 active projects totalling 103 MW in the BPA queue, plus 6 with terminal status (shown greyed).
2active projects
103active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0680 | Not reported | n/r | 300 | Battery | WITHDRAWN |
| G0833 | Not reported | 115 | 204 | Solar | WITHDRAWN |
| G0679 | Not reported | n/r | 200 | Solar | WITHDRAWN |
| G0704 | Not reported | 115 | 200 | Wind | WITHDRAWN |
| G0745 | Not reported | n/r | 100 | Solar | STUDY |
| G0692 | Not reported | 115 | 20 | Solar | WITHDRAWN |
| G1003 | Not reported | 115 | 3 | Solar | STUDY COMPLETED |
| G1067 | Not reported | 230 | 1 | Solar | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.