Substation Scout

Adams, WA interconnection queue

2 active projects totalling 103 MW in the BPA queue, plus 6 with terminal status (shown greyed).

2active projects
103active MW
8total filed
Queue IDProjectkVMWResourceStatus
G0680 Not reported n/r 300 Battery WITHDRAWN
G0833 Not reported 115 204 Solar WITHDRAWN
G0679 Not reported n/r 200 Solar WITHDRAWN
G0704 Not reported 115 200 Wind WITHDRAWN
G0745 Not reported n/r 100 Solar STUDY
G0692 Not reported 115 20 Solar WITHDRAWN
G1003 Not reported 115 3 Solar STUDY COMPLETED
G1067 Not reported 230 1 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.