Shelby, TN interconnection queue

9 active projects totaling 2,541 MW in the TVA queue, plus 26 with terminal status (shown grayed).

9active projects
2,541active MW
35total filed
Queue IDProjectkVMWResourceStatus
219 Not reported n/r 3,500 Wind Withdrawn
220 Not reported n/r 3,500 Coal Withdrawn
31 Not reported n/r 1,170 Other Withdrawn
33 Not reported n/r 1,170 Other Withdrawn
35 Not reported n/r 1,170 Other Withdrawn
37 Not reported n/r 1,170 Other Withdrawn
6 Not reported n/r 1,170 Other Withdrawn
257 Not reported n/r 1,132 Gas Active
98 Not reported n/r 931 Other Withdrawn
103 Not reported n/r 900 Other Withdrawn
225 Not reported n/r 751 Gas Withdrawn
110 Not reported n/r 750 Other Withdrawn
30 Not reported n/r 700 Other Withdrawn
32 Not reported n/r 700 Other Withdrawn
34 Not reported n/r 700 Other Withdrawn
36 Not reported n/r 700 Other Withdrawn
43 Not reported n/r 700 Other Withdrawn
5 Not reported n/r 700 Other Operational
45 Not reported n/r 640 Other Withdrawn
142 Not reported n/r 560 Other Withdrawn
75 Not reported n/r 544 Other Withdrawn
76 Not reported n/r 544 Other Withdrawn
484 Not reported n/r 300 Battery Withdrawn
47 Not reported n/r 251 Other Withdrawn
109 Not reported n/r 250 Other Withdrawn
588 Not reported n/r 238 Gas Active
661 Not reported 161 200 Battery Active
665 Not reported n/r 200 Battery Withdrawn
643 Not reported 161 100 Battery Active
333 Not reported n/r 74 Hybrid Active
345 Not reported n/r 66 Solar Withdrawn
279 Not reported n/r 60 Solar Operational
332 Not reported n/r 23 Gas Active
304 Not reported n/r 14 Gas Active
306 Not reported n/r 8 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with TVA before relying on these figures.