TVA request 588
TVA queue ID 588
Queue request 588 was listed in the TVA interconnection queue at the end of 2025 as a 238 MW gas project in Shelby County, TN, according to Berkeley Lab’s queue data file. The filing names L5396, Str 8 - Allen CCP as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2024.
| Queue ID | 588 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | L5396, Str 8 - Allen CCP |
| Point of interconnection | L5396, Str 8 - Allen CCP |
| County | Shelby |
| State | TN |
| Voltage | Not reported |
| Capacity | 238 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2024-10-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Shelby, TN: 35 requests in the TVA queue, 9 active totaling 2,541 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Facility Study |
| Queue date | 2023-11-03 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.