Substation Scout

TVA request 257

TVA queue ID 257

Queue request 257 was listed in the TVA interconnection queue at the end of 2025 as a 1,132 MW gas project in Shelby County, TN, according to Berkeley Lab’s queue data file. The filing names Allen 161-kV Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 1, 2018.

Queue ID257
Project nameNot reported
Status (as published)Active
SubstationAllen 161-kV Substation
Point of interconnectionAllen 161-kV Substation
CountyShelby
StateTN
VoltageNot reported
Capacity1,132 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2018-07-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Allen 161-kV Substation substation: 3 requests in the TVA queue, 3 active totaling 1,169 MW.

Queue IDProjectMWResourceStatus
332Not reported23GasActive
304Not reported14GasActive

Shelby, TN: 35 requests in the TVA queue, 9 active totaling 2,541 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2014-08-22

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first