TVA request 333

TVA queue ID 333

Queue request 333 was listed in the TVA interconnection queue at the end of 2025 as a 74 MW hybrid project in Shelby County, TN, according to Berkeley Lab’s queue data file. The filing names Shelby-SR Millington 161-kV TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2024.

Queue ID333
Project nameNot reported
Status (as published)Active
SubstationShelby-SR Millington 161-kV TL
Point of interconnectionShelby-SR Millington 161-kV TL
CountyShelby
StateTN
VoltageNot reported
Capacity74 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2024-05-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Shelby, TN: 35 requests in the TVA queue, 9 active totaling 2,541 MW.

Tracked changes

Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityTennessee Valley Authority
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2017-10-18
Components (hybrid)Solar 74 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.