TVA request 333
TVA queue ID 333
Queue request 333 was listed in the TVA interconnection queue at the end of 2025 as a 74 MW hybrid project in Shelby County, TN, according to Berkeley Lab’s queue data file. The filing names Shelby-SR Millington 161-kV TL as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 31, 2024.
| Queue ID | 333 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Shelby-SR Millington 161-kV TL |
| Point of interconnection | Shelby-SR Millington 161-kV TL |
| County | Shelby |
| State | TN |
| Voltage | Not reported |
| Capacity | 74 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2024-05-31 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Shelby, TN: 35 requests in the TVA queue, 9 active totaling 2,541 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Queue date | 2017-10-18 |
| Components (hybrid) | Solar 74 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.