Buzzard Roost

Named in 6 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
6projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
ADAMSVILLE - BUZZARD ROOST 230kV REBUILD AND JUMPER UPGRADE
Rebuild the line sections from Adamsville to Boat Rock Road (7.2 miles) on the Adamsville - Buzzard Roost 230kV line with 200C 1351 ACSS Martin conductor. Replace the limiting jumpers on the line at Adamsville, Bakers Ferry, and Boat Rock with higher rated jumpers. Replace limiting line switches at Boat Rock with higher rated switches.
TEAMS 19597 · plan p.85 · zone 208
GPC In the plan
p.7
Jun 1, 2026 No change Adamsville, Buzzard Roost
GTC: ADAMSVILLE - BUZZARD ROOST 230kV REBUILD
Rebuild approximately 5 miles of the Adamsville - Buzzard Roost 230kV line with 200C 1351 ACSS Martin.
TEAMS 20858 · plan p.126 · zone 201
GTC In the plan
p.10
Jun 1, 2027 No change Adamsville, Buzzard Roost
BUZZARD ROOST - FACTORY SHOALS 230kV NEW LINE
Build 2 miles of new 230kV line from Buzzard Roost to Factory Shoals with 200C 1351 ACSS Martin.
TEAMS 21036 · plan p.193 · zone 201
GPC In the plan
p.15
Jun 1, 2029 No change Buzzard Roost, FACTORY SHOALS
BUZZARD ROOST - TRIBUTARY 230kV REBUILD
Rebuild the 2.8 miles Tributary - Thornton Road 230kV line with 200C 1351 ACSS Martin.
TEAMS 21098 · plan p.234 · zone 201
GPC In the plan
p.17
Jun 1, 2030 No change Buzzard Roost, Thornton Road, Tributary
GTC: BUZZARD ROOST - THORNTON ROAD 230kV REBUILD
Rebuild the Buzzard Roost - Thornton Road 230kV line, approximately 1 mile, with 200C 1351 ACSS conductor.
TEAMS 21610 · plan p.204 · zone 201
GTC In the plan
p.15
Jun 1, 2029 New project Buzzard Roost, Thornton Road
GTC: BUZZARD ROOST – ROCKHOUSE RD 230kV REBUILD
Rebuild the Buzzard Roost – Rockhouse Road 230kV line circuit 2, approximately 0.81 mile, with 200C 1351 ACSS conductor.
TEAMS 21620 · plan p.245 · zone 201
GTC In the plan
p.18
Jun 1, 2030 New project Buzzard Roost, ROCKHOUSE RD, Rockhouse Road

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.