Substation Scout

Thornton Road

Named in 3 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
—kV in the quote
GPC, GTCproject sponsor
3projects in the plan

The plan prints no county for this substation, and no utility project page found names one for it.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
GTC: SWITCH WAY - THORNTON ROAD 230kV LINE REBUILD
Rebuild the Switch Way - Thornton Road 230kV line, approximately 1.3 mi, with minimum rating of 160C 1033 ACSS conductor.
TEAMS 20506 · plan p.136 · zone 201
GTC In the plan
p.11
Jun 1, 2027 No change Switch Way, Thornton Road
BUZZARD ROOST - TRIBUTARY 230kV REBUILD
Rebuild the 2.8 miles Tributary - Thornton Road 230kV line with 200C 1351 ACSS Martin.
TEAMS 21098 · plan p.234 · zone 201
GPC In the plan
p.17
Jun 1, 2030 No change Buzzard Roost, Thornton Road, Tributary
GTC: BUZZARD ROOST - THORNTON ROAD 230kV REBUILD
Rebuild the Buzzard Roost - Thornton Road 230kV line, approximately 1 mile, with 200C 1351 ACSS conductor.
TEAMS 21610 · plan p.204 · zone 201
GTC In the plan
p.15
Jun 1, 2029 New project Buzzard Roost, Thornton Road

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.

Before relying on any of this

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first