Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).

—county (not printed)
500kV in the quote
GTCproject sponsor
2projects in the plan

Described as new. The quoted wording describes building this substation, without the word "new". “Construct the Rum Creek 500kV switching station” — TEAMS 21345, plan p.167

The plan prints no county for this substation, and no utility project page found names one for it.

Location

On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.167 · SERTP 2026 preliminary expansion plan project list (2026-06-12), p.43 · OpenStreetMap: Bonaire Primary and Scherer substations; Bonaire - Scherer 500kV (way 9424299) and Scherer - O'Hara 500kV (way 9460274) lines (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the plan prints them. The sponsor is the project’s; one project can split work between owners.

ProjectSponsorWhere in the planNeed dateChange from the previous planSubstations named
GTC: RUM CREEK - TOMOCHICHI (BLACK) 500kV LINE
Construct a second 500kV line from Rum Creek to Tomochichi (Black) which is approximately 30 miles long with 100C (3) 1113 ACSR Bluejay conductor. Make the necessary modifications at Rum Creek and Tomochichi to add breakers and terminate the line.
TEAMS 21073 · plan p.227 · zone 214
GTC In the plan
p.17
Dec 1, 2029 Advanced from 2030 to 2029 Rum Creek, Tomochichi
GTC: SMARR 500kV TRANSMISSION SERVICE
Construct the Rum Creek 500kV switching station. Loop in the existing Bonaire Primary - Scherer and O'Hara - Scherer 500kV lines. Terminate the new Big Smarr - Rum Creek 500kV line. Construct the new line using 100C (3) 1113 ACSR Bluejay conductor.
TEAMS 21345 · plan p.167 · zone 214
GTC In the plan
p.13
Jun 1, 2028 New project Big Smarr, Ohara, Rum Creek, Scherer

Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.