Rum Creek
Named in 2 projects in the 2025 GA ITS Ten-Year Plan (2026-2035).
Described as new. The quoted wording describes building this substation, without the word "new". “Construct the Rum Creek 500kV switching station” — TEAMS 21345, plan p.167
The plan prints no county for this substation, and no utility project page found names one for it.
Location
On a named line, no point. No point is published. The planning documents place it on the transmission line named in the quote above, and both ends of that line are located. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
Sources: 2025 GA ITS Ten-Year Plan (2026-2035), Southern Company Services; filed by Georgia Power in GA PSC Docket 56002 (2025 Annual Transmission Update, public disclosure) (filed 2026-02-27), p.167 · SERTP 2026 preliminary expansion plan project list (2026-06-12), p.43 · OpenStreetMap: Bonaire Primary and Scherer substations; Bonaire - Scherer 500kV (way 9424299) and Scherer - O'Hara 500kV (way 9460274) lines (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the plan prints them. The sponsor is the project’s; one project can split work between owners.
| Project | Sponsor | Where in the plan | Need date | Change from the previous plan | Substations named |
|---|---|---|---|---|---|
| GTC: RUM CREEK - TOMOCHICHI (BLACK) 500kV LINE Construct a second 500kV line from Rum Creek to Tomochichi (Black) which is approximately 30 miles long with 100C (3) 1113 ACSR Bluejay conductor. Make the necessary modifications at Rum Creek and Tomochichi to add breakers and terminate the line. TEAMS 21073 · plan p.227 · zone 214 |
GTC | In the plan p.17 |
Dec 1, 2029 | Advanced from 2030 to 2029 | Rum Creek, Tomochichi |
| GTC: SMARR 500kV TRANSMISSION SERVICE Construct the Rum Creek 500kV switching station. Loop in the existing Bonaire Primary - Scherer and O'Hara - Scherer 500kV lines. Terminate the new Big Smarr - Rum Creek 500kV line. Construct the new line using 100C (3) 1113 ACSR Bluejay conductor. TEAMS 21345 · plan p.167 · zone 214 |
GTC | In the plan p.13 |
Jun 1, 2028 | New project | Big Smarr, Ohara, Rum Creek, Scherer |
Source: 2025 GA ITS Ten-Year Plan (2026-2035), filed by Georgia Power Company as its Annual Transmission Update in Georgia PSC Docket 56002 on February 27, 2026; public disclosure version, retrieved 2026-11-20.
Before relying on any of this
- The plan prints no county for a substation. A county shown here is printed in the plan beside the station, or on a Georgia Power or Georgia Transmission project page that names the same station and one county.
- Project Sponsor belongs to the project, not to each station; one project can split work between owners.
- Costs are redacted in the public version of the plan and are not shown.